四好公路
You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
 
 
 
 

99 lines
4.3 KiB

{
"桥梁代码": "bridge_code",
"桥梁名称": "bridge_name",
"中心桩号": "central_station",
"跨越地物类型": "crossing_figure_type",
"跨越地物名称": "crossing_figure_name",
"收费性质": "nature_of_charges",
"匝道编码": "ramp_code",
"路段类型": "section_type",
"跨越地物类型1": "crossing_figure_type_1",
"跨越地物名称1": "crossing_figure_name_1",
"原桥梁代码": "original_bridge_code",
"是否宽路窄桥": "whether_wide_road_and_narrow_bridge",
"是否在长大桥梁目录中": "is_it_in_the_directory_of_long_and_long_bridges",
"是否跨省桥梁": "whether_it_is_a_cross_provincial_Bridge",
"互通类型": "interworking_type",
"互通形式": "interworking_form",
"互通交叉方式": "interworking_and_crossover_mode",
"桥梁分类": "bridge_classification",
"桥梁全长": "total_length_of_bridge",
"跨径总长": "total_span_length",
"主桥主跨": "main_span_of_main_bridge",
"主桥孔数": "number_of_main_bridge_holes",
"跨径组合": "span_combination",
"桥梁性质": "bridge_properties",
"设计荷载等级": "design_load_class",
"上部结构": "superstructure",
"上部结构材料": "superstructure_materials",
"桥面铺装类型": "bridge_deck_pavement_type",
"桥面宽": "bridge_deck_width",
"桥面净宽": "clear_width_of_bridge_deck",
"桥下净空": "clearance_under_bridge",
"抗震等级": "seismic_grade",
"通航等级": "navigation_class",
"桥台类型": "abutment_type",
"桥墩类型": "pier_type",
"墩台防撞设施类型": "types_of_pier_and_abutment_anti_collision_facilities",
"伸缩缝类型": "expansion_joint_type",
"支座类型": "support_type",
"弯坡斜特征": "characteristics_of_curved_slope",
"桥梁高度": "bridge_height",
"人行道宽度": "sidewalk_width",
"建设单位": "construction_unit",
"建成时间": "completion_time",
"通车日期": "opening_date",
"改建时间": "reconstruction_time",
"总造价": "total_cost",
"设计单位名称": "name_of_design_unit",
"施工单位名称": "name_of_construction_unit",
"监理单位名称": "name_of_supervision_unit",
"建设性质": "nature_of_construction",
"评定日期": "evaluation_date",
"技术状况评定": "technical_condition_evaluation",
"评定单位": "assessment_unit",
"主要病害位置": "location_of_major_diseases",
"病害描述": "disease_description",
"采取管制措施": "take_control_measures",
"最近定期检查日期": "date_of_last_periodic_inspection",
"管养单位性质": "nature_of_management_and_maintenance_unit",
"管养单位": "management_and_maintenance_unit",
"监管单位": "supervision_unit",
"改造施工单位": "reconstruction_construction_unit",
"是否部补助项目": "whether_it_is_a_subsidy_project_of_the_Ministry",
"工程性质": "engineering_properties",
"改造部位": "reconstruction_part",
"改造完工日期": "modification_completion_date",
"年份1": "year_1",
"跨径组合1": "span_combination_1",
"投资1": "investment_1",
"年份2": "year_2",
"跨径组合2": "span_combination_2",
"投资2": "investment_2",
"年份3": "year_3",
"跨径组合3": "span_combination_3",
"投资3": "investment_3",
"年份4": "year_4",
"跨径组合4": "span_combination_4",
"投资4": "investment_4",
"年份5": "year_5",
"跨径组合5": "span_combination_5",
"投资5": "investment_5",
"计划资金类别": "planned_fund_category",
"计划年度": "planned_year",
"计划文号": "plan_document_No",
"计划项目唯一编码": "plan_item_unique_code",
"计划项目类型": "planned_project_type",
"计划项目名称": "plan_project_name",
"完工情况": "completion_status",
"完工年度": "year_of_completion",
"变更原因": "reason_for_change",
"变更时间": "change_time",
"填报单位": "reporting_unit",
"备注": "remarks",
"是否跨线桥": "whether_overpass_bridge",
"是否线外桥": "off_line_bridge_or_not",
"是否危桥改造": "whether_dangerous_bridge_reconstruction",
"所在区县": "districtcounty",
"所在地市": "location_city"
}